Satyam Plumbing Services

plumbing Services maintenance plumbing water supply installation drainage line installation

GSTIN No: 24AEVFS4014F1ZZ

Vasna Road Ahmedabad
Vasna Road Ahmedabad
Call StoreSend Whatsapp
All
Plumber labour charge
Satyam Service product
Splendor
 Polo Bib COCK  15 mm
Polo Bib COCK 15 mm
45
Angle Cock (QMT) Brass
Angle Cock (QMT) Brass
190
per Nos
BRASS SPLENDOR 30 grm
BRASS SPLENDOR 30 grm
70
per Nos
BRASS SPLENDOR 40 grm
BRASS SPLENDOR 40 grm
0
per Nos
Connection pipe 1.5 (foot)
Connection pipe 1.5 (foot)
60
per Nos
Connection pipe 2(Foot)
Connection pipe 2(Foot)
80
per Nos
Pvc SINK COUPLING 4''
Pvc SINK COUPLING 4''
75
per Nos
R O Brass VALVES 10 MM
R O Brass VALVES 10 MM
90
per Nos
R.O PVc Bib Cock
R.O PVc Bib Cock
35
per Nos
0.75 inch Black PVC Garden Hose Pipe –0.75 inch Black PVC Garden Hose Pipe –
0.75 inch Black PVC Garden Hose Pipe –
0
per Mtr
0.75" Garden Hose Pipe0.75" Garden Hose Pipe
0.75" Garden Hose Pipe
0
per Nos
1 Bathroom complete plumbing workMarking and cutting (chasing)CP and sanitary fitting with riser lineTerrace line workRiser line up to parking (handover)Almost complete fitting work1 Bathroom complete plumbing workMarking and cutting (chasing)CP and sanitary fitting with riser lineTerrace line workRiser line up to parking (handover)Almost complete fitting work
1 Bathroom complete plumbing workMarking and cutting (chasing)CP and sanitary fitting with riser lineTerrace line workRiser line up to parking (handover)Almost complete fitting work
0
20 Ton Capacity Manual Cover ka purchase (supply), cleaning aur installation ka kaam kiya gaya”20 Ton Capacity Manual Cover ka purchase (supply), cleaning aur installation ka kaam kiya gaya”
20 Ton Capacity Manual Cover ka purchase (supply), cleaning aur installation ka kaam kiya gaya”
4850
per Nos
22/7/2026  37 No aagman farm  motor installation22/7/2026  37 No aagman farm  motor installation
22/7/2026 37 No aagman farm motor installation
1800
3 Bathroom, 1 Kitchen, Drainage Line Manual Gali Type, Pump & Tank Connection sahit Complete Villa Plumbing Work.3 Bathroom, 1 Kitchen, Drainage Line Manual Gali Type, Pump & Tank Connection sahit Complete Villa Plumbing Work.
3 Bathroom, 1 Kitchen, Drainage Line Manual Gali Type, Pump & Tank Connection sahit Complete Villa Plumbing Work.
0
3/8/26  Bougaln Villa   1 pump was installed, and 2 pumps were removed.3/8/26  Bougaln Villa   1 pump was installed, and 2 pumps were removed.
3/8/26 Bougaln Villa 1 pump was installed, and 2 pumps were removed.
3000
5/8/26  Bougaln Villa   3 pump was installed, and 2 pumps were removed.5/8/26  Bougaln Villa   3 pump was installed, and 2 pumps were removed.
5/8/26 Bougaln Villa 3 pump was installed, and 2 pumps were removed.
6000
600 × 600 mm Manhole Cover ReplacementRemoving the existing 600 × 600 mm manhole cover, supplying a new manhole cover with frame, and complete installation including all labour, tools, transportation, and necessary materials.600 × 600 mm Manhole Cover ReplacementRemoving the existing 600 × 600 mm manhole cover, supplying a new manhole cover with frame, and complete installation including all labour, tools, transportation, and necessary materials.
600 × 600 mm Manhole Cover ReplacementRemoving the existing 600 × 600 mm manhole cover, supplying a new manhole cover with frame, and complete installation including all labour, tools, transportation, and necessary materials.
0
per Nos
600 × 600 mm Manhole Cover – Supply & Installation (including removal of old cover, new cover purchase, labour, and all incidental charges).600 × 600 mm Manhole Cover – Supply & Installation (including removal of old cover, new cover purchase, labour, and all incidental charges).
600 × 600 mm Manhole Cover – Supply & Installation (including removal of old cover, new cover purchase, labour, and all incidental charges).
4350
per Nos
Angle CockAngle Cock
Angle Cock
0
per Nos
Bathroom Riser Line & Water Supply: Installation of bathroom riser line and water supply, including CP and sanitary fittings. All remaining plumbing work inside the bathroom will be completed, and after completion, the water supply will be started and tested. All necessary labour, fittings and required work are included.Bathroom Riser Line & Water Supply: Installation of bathroom riser line and water supply, including CP and sanitary fittings. All remaining plumbing work inside the bathroom will be completed, and after completion, the water supply will be started and tested. All necessary labour, fittings and required work are included.
Bathroom Riser Line & Water Supply: Installation of bathroom riser line and water supply, including CP and sanitary fittings. All remaining plumbing work inside the bathroom will be completed, and after completion, the water supply will be started and tested. All necessary labour, fittings and required work are included.
0
Bathroom fitting, water supply aur drainage ka kaam kiya gaya hai. Saath hi Orissa paint aur N.T. type ke saath finishing ka kaam bhi kiya gaya hai.”Bathroom fitting, water supply aur drainage ka kaam kiya gaya hai. Saath hi Orissa paint aur N.T. type ke saath finishing ka kaam bhi kiya gaya hai.”
Bathroom fitting, water supply aur drainage ka kaam kiya gaya hai. Saath hi Orissa paint aur N.T. type ke saath finishing ka kaam bhi kiya gaya hai.”
7500
Bathroom, 1 Kitchen, Drainage Line Manual Gali Type, Pump & Tank Connection sahit Complete Villa Plumbing Work.Bathroom, 1 Kitchen, Drainage Line Manual Gali Type, Pump & Tank Connection sahit Complete Villa Plumbing Work.
Bathroom, 1 Kitchen, Drainage Line Manual Gali Type, Pump & Tank Connection sahit Complete Villa Plumbing Work.
0
per Nos
Borewell ki main line mein connection dene ke liye Ball valves tee fitting install ki gayi thi.”Borewell ki main line mein connection dene ke liye Ball valves tee fitting install ki gayi thi.”
Borewell ki main line mein connection dene ke liye Ball valves tee fitting install ki gayi thi.”
2000
per Nos
Borewell ki main line toot gayi thi, jiska repairing ka kaam kiya gayaBorewell ki main line toot gayi thi, jiska repairing ka kaam kiya gaya
Borewell ki main line toot gayi thi, jiska repairing ka kaam kiya gaya
1200
Breaking of the existing 7×10 area and providing new plaster work. Material and labour both are included.Breaking of the existing 7×10 area and providing new plaster work. Material and labour both are included.
Breaking of the existing 7×10 area and providing new plaster work. Material and labour both are included.
0
per Sqf
Brick wallBrick wall
Brick wall
0
per Sqf
Brick wall 8 inch × 40 sq.ft ka rate kaise nikale?Brick wall 8 inch × 40 sq.ft ka rate kaise nikale?
Brick wall 8 inch × 40 sq.ft ka rate kaise nikale?
5000
CP jali  150x150CP jali  150x150
CP jali 150x150
0
per Nos
CP jali installationCP jali installation
CP jali installation
0
per Nos
Carefully remove the existing old wall tiles and dispose of the debris. Supply and install new wall tiles using high-quality tile adhesive, complete joint filling with matching grout, and finish the work neatly.Carefully remove the existing old wall tiles and dispose of the debris. Supply and install new wall tiles using high-quality tile adhesive, complete joint filling with matching grout, and finish the work neatly.
Carefully remove the existing old wall tiles and dispose of the debris. Supply and install new wall tiles using high-quality tile adhesive, complete joint filling with matching grout, and finish the work neatly.
0
per Sqf
Civil Work 50 Sqft (including material)Civil Work 50 Sqft (including material)
Civil Work 50 Sqft (including material)
0
Complete Plumbing Work for 3 BHK / ncluding Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications.Complete Plumbing Work for 3 BHK / ncluding Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications.
Complete Plumbing Work for 3 BHK / ncluding Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications.
48000
per Bag
Complete Plumbing Work for 3 BHK / ncluding Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications..Complete Plumbing Work for 3 BHK / ncluding Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications..
Complete Plumbing Work for 3 BHK / ncluding Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications..
58000
per Unit
Complete Plumbing Work for 4 BHK Flat including Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications.Complete Plumbing Work for 4 BHK Flat including Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications.
Complete Plumbing Work for 4 BHK Flat including Toilets, Kitchen & Wash Yard comprising CP Fittings, Sanitary Ware, Soil Waste Line, Waste Water Line, AC Drain Line, Rain Water Line, Terrace Pipe Line, Basement Drainage Line, Drainage Chambers within Premises, STP Connections, Water Supply Line, Cutting, Core Cutting (where required), Fixing of Flush Tank, Testing, Commissioning and Final Finishing as per approved drawings and specifications.
62000
per Unit
Complete kitchen plumbing fittingMarking and cutting workSink and waste line connectionWater inlet & outlet fittingCP fittings installationComplete kitchen plumbing fittingMarking and cutting workSink and waste line connectionWater inlet & outlet fittingCP fittings installation
Complete kitchen plumbing fittingMarking and cutting workSink and waste line connectionWater inlet & outlet fittingCP fittings installation
0
Completed manual electrical earthing work by excavating the ground and installing 2 earthing pits.Completed manual electrical earthing work by excavating the ground and installing 2 earthing pits.
Completed manual electrical earthing work by excavating the ground and installing 2 earthing pits.
13000
Concealed flush tank and foot valve need to be purchased and installed.Concealed flush tank and foot valve need to be purchased and installed.
Concealed flush tank and foot valve need to be purchased and installed.
1500
per Nos
Concrete workSize: 8ft × 2ftDepth: 4 inchIncluding material & labourConcrete workSize: 8ft × 2ftDepth: 4 inchIncluding material & labour
Concrete workSize: 8ft × 2ftDepth: 4 inchIncluding material & labour
5500
per Nos
Diesel Tank Boundary Brick WallWall Height: 2 FtTotal Area: 18 Sq.ftDiesel Tank Boundary Brick WallWall Height: 2 FtTotal Area: 18 Sq.ft
Diesel Tank Boundary Brick WallWall Height: 2 FtTotal Area: 18 Sq.ft
6000
Dismantling of Existing 160 mm PVC Basement Drainage Line, including removal of clamps and supports, careful cutting of the pipe, and preparation of reusable pipe sections for shifting and reinstallation at a new location.Dismantling of Existing 160 mm PVC Basement Drainage Line, including removal of clamps and supports, careful cutting of the pipe, and preparation of reusable pipe sections for shifting and reinstallation at a new location.
Dismantling of Existing 160 mm PVC Basement Drainage Line, including removal of clamps and supports, careful cutting of the pipe, and preparation of reusable pipe sections for shifting and reinstallation at a new location.
0
per Sqf
Dismantling of old/existing gully trapBreaking of Kota/RCC flooring as requiredProviding and installation of new gully trapConnection to existing main drainage lineOne hole/core cutting as requiredRe-fixing and finishing of flooringAll materials and labour includedDismantling of old/existing gully trapBreaking of Kota/RCC flooring as requiredProviding and installation of new gully trapConnection to existing main drainage lineOne hole/core cutting as requiredRe-fixing and finishing of flooringAll materials and labour included
Dismantling of old/existing gully trapBreaking of Kota/RCC flooring as requiredProviding and installation of new gully trapConnection to existing main drainage lineOne hole/core cutting as requiredRe-fixing and finishing of flooringAll materials and labour included
0
Door repairingDoor repairing
Door repairing
7000
per Nos
Duck area ke niche wali damaged wall ko tod kar nayi deewar banana (approx. 12 sq. ft.).Purane tute hue plaster ko poori tarah se nikalna.Nayi wall par double coat plaster karna (proper finishing ke saath).Duck area ke niche wali damaged wall ko tod kar nayi deewar banana (approx. 12 sq. ft.).Purane tute hue plaster ko poori tarah se nikalna.Nayi wall par double coat plaster karna (proper finishing ke saath).
Duck area ke niche wali damaged wall ko tod kar nayi deewar banana (approx. 12 sq. ft.).Purane tute hue plaster ko poori tarah se nikalna.Nayi wall par double coat plaster karna (proper finishing ke saath).
46000
Earthing WorkEarthing Work
Earthing Work
4000
Electrical Earthing Manhole WorkElectrical Earthing Manhole Work
Electrical Earthing Manhole Work
8000
per Nos
Existing bathroom dismantling karke new water supply aur drainage system ki complete fitting aur installation karna hai.Existing bathroom dismantling karke new water supply aur drainage system ki complete fitting aur installation karna hai.
Existing bathroom dismantling karke new water supply aur drainage system ki complete fitting aur installation karna hai.
0
per Nos
Experienced in fabrication work, leading labour teams, and completing various small and largeExperienced in fabrication work, leading labour teams, and completing various small and large
Experienced in fabrication work, leading labour teams, and completing various small and large
12000
per Nos
Fabrication WorkFabrication Work
Fabrication Work
12000
Fabrication of MS Bracket (350 × 320 × 160 mm), including primer and paint, fixing with anchor fasteners, complete in all respectsFabrication of MS Bracket (350 × 320 × 160 mm), including primer and paint, fixing with anchor fasteners, complete in all respects
Fabrication of MS Bracket (350 × 320 × 160 mm), including primer and paint, fixing with anchor fasteners, complete in all respects
0
per Nos
Falsh tank serviceFalsh tank service
Falsh tank service
0
per Nos
Flooring Tiles 150 Sqft (Material + LabourFlooring Tiles 150 Sqft (Material + Labour
Flooring Tiles 150 Sqft (Material + Labour
0
per Nos
Gate per purana Jung laga hua haiUse nikal kar naye se paint karna haiGate per purana Jung laga hua haiUse nikal kar naye se paint karna hai
Gate per purana Jung laga hua haiUse nikal kar naye se paint karna hai
0
Gents toilet wash basin drain pipe blockedGents toilet wash basin drain pipe blocked
Gents toilet wash basin drain pipe blocked
850
per Nos
HDPE pipe ka connection 2 jagah par kiya gaya hai.”HDPE pipe ka connection 2 jagah par kiya gaya hai.”
HDPE pipe ka connection 2 jagah par kiya gaya hai.”
1500
Hindware Dual Flush CeramicHindware Dual Flush Ceramic
Hindware Dual Flush Ceramic
0
per Nos
Hindware WC (Water Closet/Commode)Hindware WC (Water Closet/Commode)
Hindware WC (Water Closet/Commode)
14000
per Nos
Hindware WC and Flush TankOld set removing and new set installation.Including record bolt and visor.Purchase and installation included.Hindware WC and Flush TankOld set removing and new set installation.Including record bolt and visor.Purchase and installation included.
Hindware WC and Flush TankOld set removing and new set installation.Including record bolt and visor.Purchase and installation included.
17500
per Nos
Hindware WC and seat coverHindware WC and seat cover
Hindware WC and seat cover
0
Installation of 160 mm PVC Drainage Pipeline, including all necessary fittings, clamps, threaded rods (tie rods), bullet fasteners, supports, and all fixing materials. The work includes complete installation, alignment, and connection to the existing drainage pipeline, including testing and commissioning.Installation of 160 mm PVC Drainage Pipeline, including all necessary fittings, clamps, threaded rods (tie rods), bullet fasteners, supports, and all fixing materials. The work includes complete installation, alignment, and connection to the existing drainage pipeline, including testing and commissioning.
Installation of 160 mm PVC Drainage Pipeline, including all necessary fittings, clamps, threaded rods (tie rods), bullet fasteners, supports, and all fixing materials. The work includes complete installation, alignment, and connection to the existing drainage pipeline, including testing and commissioning.
0
per Sqf
Installation of Tactile TilesInstallation of Tactile Tiles
Installation of Tactile Tiles
50
per Nos
Jaguar sink cock needs to be purchased and installed.Jaguar sink cock needs to be purchased and installed.
Jaguar sink cock needs to be purchased and installed.
2700
per Nos
Kota Stone Re-InstallationKota Stone Re-Installation
Kota Stone Re-Installation
1000
Labour chargeLabour charge
Labour charge
0
per Nos
Ladies toilet wc drainage line blockedLadies toilet wc drainage line blocked
Ladies toilet wc drainage line blocked
1400
per Nos
MS ClampMS Clamp
MS Clamp
0
per Nos
MS Gate Frame Replacement (9 ft × 7 ft)MS Gate Frame Replacement (9 ft × 7 ft)
MS Gate Frame Replacement (9 ft × 7 ft)
0
per Nos
MS SANDAL CLAMPMS SANDAL CLAMP
MS SANDAL CLAMP
0
per Nos
MS jali par lukka handle ka fabrication aur welding work karke installation complete kiya gaya hai.”MS jali par lukka handle ka fabrication aur welding work karke installation complete kiya gaya hai.”
MS jali par lukka handle ka fabrication aur welding work karke installation complete kiya gaya hai.”
1200
per Nos
Main Gate ke paas approx. 50 feet electric piping ka installation ka kaam kiya gaya”Main Gate ke paas approx. 50 feet electric piping ka installation ka kaam kiya gaya”
Main Gate ke paas approx. 50 feet electric piping ka installation ka kaam kiya gaya”
4500
per Nos
PVC Gully TrapPVC Gully Trap
PVC Gully Trap
0
per Nos
Pariy Blochar 1003    (heat pump installationPariy Blochar 1003    (heat pump installation
Pariy Blochar 1003 (heat pump installation
1800
Pipeline installation labour chargePipeline installation labour charge
Pipeline installation labour charge
0
per Nos
Plumber Visit ChargesPlumber Visit Charges
Plumber Visit Charges
0
Plumber Visit chargePlumber Visit charge
Plumber Visit charge
150
Plumber visitPlumber visit
Plumber visit
0
Plumber visit chargesPlumber visit charges
Plumber visit charges
150
Plumbing Pipeline Modification & Repair – Existing plumbing pipeline to be modified/replaced as required, including rectification of damaged/leakage points. Rate includes all materials, fittings, labour, testing, and commissioning, complete in all respects.Plumbing Pipeline Modification & Repair – Existing plumbing pipeline to be modified/replaced as required, including rectification of damaged/leakage points. Rate includes all materials, fittings, labour, testing, and commissioning, complete in all respects.
Plumbing Pipeline Modification & Repair – Existing plumbing pipeline to be modified/replaced as required, including rectification of damaged/leakage points. Rate includes all materials, fittings, labour, testing, and commissioning, complete in all respects.
0
per Nos
Plumbing Service Work including servicing by Tinku”Plumbing Service Work including servicing by Tinku”
Plumbing Service Work including servicing by Tinku”
4000
Plumbing Work – CP & Sanitary Fitting ReinstallationWork Description:Carefully removing existing CP and sanitary fittings and reinstalling them after the tile work with proper alignment, sealing, and leak testing.Plumbing Work – CP & Sanitary Fitting ReinstallationWork Description:Carefully removing existing CP and sanitary fittings and reinstalling them after the tile work with proper alignment, sealing, and leak testing.
Plumbing Work – CP & Sanitary Fitting ReinstallationWork Description:Carefully removing existing CP and sanitary fittings and reinstalling them after the tile work with proper alignment, sealing, and leak testing.
0
per Nos
Polo angle cock 15 mm plasticPolo angle cock 15 mm plastic
Polo angle cock 15 mm plastic
60
per Pcs
Polo health posetPolo health poset
Polo health poset
120
Providing & Fixing Hindware Wash Basin complete with Gwal Pillar Cock, waste coupling, bottle trap, angle valve, connection pipe, water supply & waste piping, all necessary fittings, installation, testing and commissioning.Providing & Fixing Hindware Wash Basin complete with Gwal Pillar Cock, waste coupling, bottle trap, angle valve, connection pipe, water supply & waste piping, all necessary fittings, installation, testing and commissioning.
Providing & Fixing Hindware Wash Basin complete with Gwal Pillar Cock, waste coupling, bottle trap, angle valve, connection pipe, water supply & waste piping, all necessary fittings, installation, testing and commissioning.
0
per Nos
Providing & Fixing New CP Jali (including purchase, installation, and labour)Providing & Fixing New CP Jali (including purchase, installation, and labour)
Providing & Fixing New CP Jali (including purchase, installation, and labour)
0
per Nos
Pvc ,50 mm pipePvc ,50 mm pipe
Pvc ,50 mm pipe
0
per Sqf
Pvc 110 Mm InstallationPvc 110 Mm Installation
Pvc 110 Mm Installation
130
per Nos
Pvc 50 mm  ElwoaPvc 50 mm  Elwoa
Pvc 50 mm Elwoa
0
per Nos
Pvc 50x50mm Gully TrapPvc 50x50mm Gully Trap
Pvc 50x50mm Gully Trap
0
per Nos
Re-plastering the wall after tile removal to make the surface even and ready for finishing.Re-plastering the wall after tile removal to make the surface even and ready for finishing.
Re-plastering the wall after tile removal to make the surface even and ready for finishing.
0
per Sqf
Removal & Reinstallation  Borewell Pipe with Submersible Pump Replacement – Installation Charges OnlyRemoval & Reinstallation  Borewell Pipe with Submersible Pump Replacement – Installation Charges Only
Removal & Reinstallation Borewell Pipe with Submersible Pump Replacement – Installation Charges Only
0
per Rft
Removal & Reinstallation of Borewell Pipe with Submersible Pump Replacement – Installation Charges OnlyRemoval & Reinstallation of Borewell Pipe with Submersible Pump Replacement – Installation Charges Only
Removal & Reinstallation of Borewell Pipe with Submersible Pump Replacement – Installation Charges Only
48
per Rft
Removal of existing tiles, surface preparation, and installation of new floor tilesRemoval of existing tiles, surface preparation, and installation of new floor tiles
Removal of existing tiles, surface preparation, and installation of new floor tiles
85
per Sqf
Removal of old damaged tiles and installation of new floor tiles. Area: 100 Sqft. Including removal of existing tiles, surface preparation, laying new tiles with tile adhesive, joint filling, alignment, and finishing.Removal of old damaged tiles and installation of new floor tiles. Area: 100 Sqft. Including removal of existing tiles, surface preparation, laying new tiles with tile adhesive, joint filling, alignment, and finishing.
Removal of old damaged tiles and installation of new floor tiles. Area: 100 Sqft. Including removal of existing tiles, surface preparation, laying new tiles with tile adhesive, joint filling, alignment, and finishing.
0
per Sqf
Removing wall tiles carefully from the surface.Removing wall tiles carefully from the surface.
Removing wall tiles carefully from the surface.
0
per Sqf
Repairing and replacement of the pipeline from the bore main line up to the water meter. Material and labour both are included.Repairing and replacement of the pipeline from the bore main line up to the water meter. Material and labour both are included.
Repairing and replacement of the pipeline from the bore main line up to the water meter. Material and labour both are included.
4600
Replacement of the 2×2 manual cover, including the required civil worReplacement of the 2×2 manual cover, including the required civil wor
Replacement of the 2×2 manual cover, including the required civil wor
4300
SS Floor Drain JaliSS Floor Drain Jali
SS Floor Drain Jali
0
per Nos
Sarudi ball valves installationSarudi ball valves installation
Sarudi ball valves installation
1200
per Nos
SholusanSholusan
Sholusan
0
per Gm
Sink CockSink Cock
Sink Cock
0
per Nos
«12»